ISP move

m (Things to be done)
m (Things to be done)
Line 11: Line 11:
* Physical copy or rsync or both? - tekojo, xfade, feri
* Physical copy or rsync or both? - tekojo, xfade, feri
* Verify connections once the hardware is there
* Verify connections once the hardware is there
-
* Do the actual move of servies
+
* Do the actual move of servicies
* Verify all services to be running and connected
* Verify all services to be running and connected
* Inform DNS on move and agree switchover time
* Inform DNS on move and agree switchover time

Revision as of 10:39, 29 October 2009

Agreement with the new ISP has been signed. Now we are waiting for them to get the hardware to the server room. After that the services will be copied over to the new set-up.

The servers will be run side by side for a while to verify the set-up.


Things to be done

  • Discuss the nitty gritty details with Akamai - tekojo
  • Physical copy or rsync or both? - tekojo, xfade, feri
  • Verify connections once the hardware is there
  • Do the actual move of servicies
  • Verify all services to be running and connected
  • Inform DNS on move and agree switchover time
  • Certs - stezz

Once in the new space

Some services could do with a version upgrade

  • Bugzilla - feri, aklapper
  • Garage - feri

Single Sign On should have a machine in place after the move. Services can start to connect to that one by one. But it is a longer task.