Editing Mer/Sprints
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 36: | Line 36: | ||
* Sprints run for 4 weeks at a time, where after 3 weeks the current progress in the Testing repository will be made into testing images and non-bug-fixes uploads to Testing are forbidden (feature freeze - work can still be done in Devel repository). After sprint completion, final images are built and release post posted along with achievements of the sprint. | * Sprints run for 4 weeks at a time, where after 3 weeks the current progress in the Testing repository will be made into testing images and non-bug-fixes uploads to Testing are forbidden (feature freeze - work can still be done in Devel repository). After sprint completion, final images are built and release post posted along with achievements of the sprint. | ||
+ | |||
+ | Current sprint: | ||
+ | * 0.15: 15 June 2009 - 6 July (feature freeze), Testing period: 6 July 2009 - 13 July 2009 | ||
Everything is posted on http://guest:guest@trac.tspre.org:9010 | Everything is posted on http://guest:guest@trac.tspre.org:9010 |
Learn more about Contributing to the wiki.