Editing Mer/Sprints

Warning: You are not logged in. Your IP address will be recorded in this page's edit history.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision Your text
Line 36: Line 36:
* Sprints run for 4 weeks at a time, where after 3 weeks the current progress in the Testing repository will be made into testing images and non-bug-fixes uploads to Testing are forbidden (feature freeze - work can still be done in Devel repository). After sprint completion, final images are built and release post posted along with achievements of the sprint.
* Sprints run for 4 weeks at a time, where after 3 weeks the current progress in the Testing repository will be made into testing images and non-bug-fixes uploads to Testing are forbidden (feature freeze - work can still be done in Devel repository). After sprint completion, final images are built and release post posted along with achievements of the sprint.
 +
 +
Current sprint:
 +
*  0.15: 15 June 2009 - 6 July (feature freeze), Testing period: 6 July 2009 - 13 July 2009
Everything is posted on http://guest:guest@trac.tspre.org:9010
Everything is posted on http://guest:guest@trac.tspre.org:9010

Learn more about Contributing to the wiki.


Please note that all contributions to maemo.org wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see maemo.org wiki:Copyrights for details). Do not submit copyrighted work without permission!


Cancel | Editing help (opens in new window)

Templates used on this page: