Editing Mer/Sprints
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 1: | Line 1: | ||
- | |||
- | |||
<imagemap>Image:Mer-logo.png|left|160px | <imagemap>Image:Mer-logo.png|left|160px | ||
rect 0 0 160 136 [[Mer]] | rect 0 0 160 136 [[Mer]] | ||
Line 9: | Line 7: | ||
== How do I participate in Mer? == | == How do I participate in Mer? == | ||
- | |||
- | |||
See {{main|Mer/People}} | See {{main|Mer/People}} | ||
Line 36: | Line 32: | ||
* Sprints run for 4 weeks at a time, where after 3 weeks the current progress in the Testing repository will be made into testing images and non-bug-fixes uploads to Testing are forbidden (feature freeze - work can still be done in Devel repository). After sprint completion, final images are built and release post posted along with achievements of the sprint. | * Sprints run for 4 weeks at a time, where after 3 weeks the current progress in the Testing repository will be made into testing images and non-bug-fixes uploads to Testing are forbidden (feature freeze - work can still be done in Devel repository). After sprint completion, final images are built and release post posted along with achievements of the sprint. | ||
+ | |||
+ | Current sprint: | ||
+ | * 0.15: 15 June 2009 - 6 July (feature freeze), Testing period: 6 July 2009 - 13 July 2009 | ||
Everything is posted on http://guest:guest@trac.tspre.org:9010 | Everything is posted on http://guest:guest@trac.tspre.org:9010 | ||
Line 68: | Line 67: | ||
** Develop your area - add new tasks to backlog when they come up and work with the other mentors to decide direction of Mer in general | ** Develop your area - add new tasks to backlog when they come up and work with the other mentors to decide direction of Mer in general | ||
** Add incoming bug reports as tasks to backlog to be looked into in your sprint page. | ** Add incoming bug reports as tasks to backlog to be looked into in your sprint page. | ||
- | + | ||
== Completed sprints == | == Completed sprints == | ||
- | + | * Mer Sprint 0.15: 15 June 2009 - 6 July (feature freeze), Testing period: 6 July 2009 - 13 July 2009 | |
- | + | ||
- | + | ||
- | + | ||
- | * Mer Sprint 0.15: 15 June 2009 - 6 July (feature freeze), Testing period: 6 July 2009 - | + | |
* [[Mer/Sprints/0.14|Mer Sprint 0.14]]: 18 May 2009 - 8 June (feature freeze), Testing period: 8 June 2009 - 15 June 2009 | * [[Mer/Sprints/0.14|Mer Sprint 0.14]]: 18 May 2009 - 8 June (feature freeze), Testing period: 8 June 2009 - 15 June 2009 | ||
* [[Mer/Sprints/0.13|Mer Sprint 0.13]]: 27 April 2009 - 11 May 2009 (feature freeze), Testing period: 11 May 2009 - 18 May 2009 | * [[Mer/Sprints/0.13|Mer Sprint 0.13]]: 27 April 2009 - 11 May 2009 (feature freeze), Testing period: 11 May 2009 - 18 May 2009 | ||
Line 85: | Line 80: | ||
* [[Mer/Sprints/0.6|Mer Sprint 0.6]]: -18 January 2009 (release) | * [[Mer/Sprints/0.6|Mer Sprint 0.6]]: -18 January 2009 (release) | ||
- | + | [[Category:Mer|Sprints]] |
Learn more about Contributing to the wiki.