Editing Maemo Summit 2009/Infrastructure
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 5: | Line 5: | ||
* Low-tech: flip-charts & markers | * Low-tech: flip-charts & markers | ||
* Projectors, a/v, mics? | * Projectors, a/v, mics? | ||
- | * Wifi - Big Pipe, up to 1.5x attendees connected to wifi at same time, allocate 100kB/s/connection - 300 attendees = 45MB/s bandwidth requirement | + | * Wifi - Big Pipe, up to 1.5x attendees connected to wifi at same time, allocate 100kB/s/connection - 300 attendees = 45MB/s bandwidth requirement. |
* Electricity - need power strips everywhere. Every seat should be within reach of one. | * Electricity - need power strips everywhere. Every seat should be within reach of one. | ||
* Room configurations - chairs, podiums, etc | * Room configurations - chairs, podiums, etc | ||
Line 19: | Line 19: | ||
Speakers needing anything different need to do their requests in due time or come with their equipment at their own risk. | Speakers needing anything different need to do their requests in due time or come with their equipment at their own risk. | ||
- | |||
- |
Learn more about Contributing to the wiki.